• Store adhesive at a minimum temperature
of 68° F (20° C) for 24 hours prior to
installation.
• Condition flooring per manufacturer’s
recommendations.
• Ensure substrate, flooring and surrounding
areas are clean and dust free.
• Damp-mop substrate if dust is present.
• Only use Portland based patching and
leveling compounds.
• Shake aerosol can
